visual3d:documentation:pipeline:metric_commands:metric_integrate
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
visual3d:documentation:pipeline:metric_commands:metric_integrate [2025/09/24 15:49] – wikisysop | visual3d:documentation:pipeline:metric_commands:metric_integrate [2025/10/03 13:07] (current) – [Example: Calculating Joint Work Using Integration] wikisysop | ||
---|---|---|---|
Line 39: | Line 39: | ||
|**RESULT_METRIC_FOLDER**|**The name of the result signal folder**| | |**RESULT_METRIC_FOLDER**|**The name of the result signal folder**| | ||
|**RESULT_METRIC_NAME**|**The name of the result signal**| | |**RESULT_METRIC_NAME**|**The name of the result signal**| | ||
- | |**EVENT_SEQUENCE**|** A list of events (separated by " | + | |**APPLY_AS_SUFFIX_TO_SIGNAL_NAME**|**Specify the metric name to be the ORIGINAL signal plus a SUFFIX**| |
+ | |**SIGNAL_TYPES**|**Specify the signal type**| | ||
+ | |**SIGNAL_FOLDER**|**Specify the origin folder**| | ||
+ | |**SIGNAL_NAMES**|**Specify the Signal to be used**| | ||
+ | |**COMPONENT_SEQUENCE**|**Specify the Signal components to be used (e.g. X + Y + Z or 0 + 1 + 2 etc)**| | ||
+ | |**EVENT_SEQUENCE**|**A list of events (separated by " | ||
+ | |**EXCLUDE_EVENTS**|**If this event occurs before the first and last event, do not computed a metric**| | ||
+ | |**GENERATE_MEAN_AND_STDDEV**|**Generate the mean and standard deviation of this metric**| | ||
+ | |**GENERATE_MEAN_AND_STDDEV_ACROSS_SUBJECTS**|**Generate the mean and standard deviation of this metric across ranges and files**| | ||
+ | |**APPEND_TO_EXISTING_VALUES**|**Add these metric values to an existing metric**| | ||
====Dialog===== | ====Dialog===== | ||
Line 105: | Line 114: | ||
</ | </ | ||
- | 6 new metrics have now been computed, the work, mean work, and standards deviation of work done for the left and right knees. Comparing the work done in each stride and mean work done for the left and right sides will help to identify | + | 6 new metrics have now been computed, the work, mean work, and standards deviation of work done for the left and right knees. Comparing the work done in each stride and mean work done for the left and right sides will help to identify |
+ | The results should look something like this: | ||
+ | |||
+ | {{: | ||
====Complex Examples==== | ====Complex Examples==== | ||
visual3d/documentation/pipeline/metric_commands/metric_integrate.1758728959.txt.gz · Last modified: 2025/09/24 15:49 by wikisysop